更新时间:2021-05-28 16:42:37
封面
书名页
版权页
Announcement of the Ministry of Housing and Urban-Rural Development of the People s Republic of China
Foreword
1 General Provisions
2 Terms and Symbols
2.1 Terms
2.2 Symbols
3 Equipment Installation(Cable Duct,Cable Rack)
3.1 General Requirements
3.2 Installation of Cable Duct and Cabling Rack
3.3 Equipment Frame and Subframe Installation
3.4 Network Management Equipment Installation
3.5 Cable Laying and Terminating
4 Function Check and Performance Testing of Equipment
4.1 Power and Equipment Function Check
4.2 OMU Performance Testing
4.3 ODU Performance Testing
4.4 Comb Filter Performance Testing
4.5 OADM Performance Testing
4.6 OTU Performance Testing
4.7 T-MUX Performance Testing
4.8 OLA Performance Testing
4.9 OSA Performance Testing
4.10 OSC Performance Testing
5 Performance Testing and Function Check of the WDM System
5.1 System Performance Testing
5.2 System Function Check
5.3 Auxiliary Function Check
5.4 Network Management Function Check
6 As-built Document
7 Acceptance
7.1 Preliminary Acceptance
7.2 Trial Run
7.3 Final Acceptance
Appendix A Testing Record Samples
Explanation of Wording in This Code