复杂制造系统的可重构计划与调度
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

参 考 文 献

[1] Simon H. The architecture of complexity. Proceedings of the American philosophical society,1962,106 (6):467-482.

[2] Deshmukh A V,Talavage J J,Barash M M. Complexity in manufacturing systems. part 1:analysis of static complexity. IIE Transactions,1998,30 (10):645-655.  

[3] Casti J L. Connectivity,complexity and catastrophe in large-scale system. New York:Wiley,1979.

[4] 饶运清,Janet E. 基于信息熵的制造系统通过复杂性测度及其在调度中的应用[J]. 机械工程学报,2006,42(7):8-13. 

[5] Kumar P R. Re-entrant lines. Queueing Systems,1993,12 (1-2):87-110.

[6] Jensen M T. Robust and flexible scheduling with evolutionary computation:[D]. Aarhus:Department of Computer Science,University of Aarhus,2001.

[7] 吴启迪,乔非,李莉,等. 半导体制造系统调度. 北京:电子工业出版社,2006.

[8] Williams T J. The Purdue Enterprise Reference Architecture. Computers in Industry,1994,24(2-3):141-158.

[9] 柴天佑,金以慧,任德祥,等. 基于三层结构的流程工业现代集成制造系统. 控制工程,2002,9(3):1-6.

[10] 李民锋,阳春华,桂卫华. 基于CIMS三层结构环境的成本管理在钢铁工业的应用研究. 计算技术与自动化,2003,22(2):93-96.

[11] Wein L M. Scheduling semiconductor wafer fabrication[J]. Semiconductor Manufacturing,IEEE Transactions on,1988,1(3):115-130.

[12] C. Roger Glassey,Mauricio G. C. Resende. Closed-loop job release control for VLSI circuit manufacturing[J]. IEEE Transactions on Semiconductor Manufacturing,1988,1(1):36-46.

[13] 王中杰,吴启迪. 半导体生产线控制与调度研究[J]. 计算机集成制造系统,2002,8(8):607-611.

[14] Hopp W,Spearman M. Throughput of a constant work in process manufacturing line subject to failures[J]. International Journal of Production Research,1991,29(3):635-655.

[15] Lin Y H,Lee C E. A total standard WIP estimationmethod forwafer fabrication[J]. European Journal of Operational Research,2001,131(1):78-94.

[16] Goldratt E M,Cox J. The goal:Excellence in manufacturing[M]. Croton-on-Hudson,NY:North River Press,1984.  

[17] Rose O. CONLOAD—A new lot release rule for semiconductor wafer fabs[C]. Proceedings of the 31st conference on Winter simulation:Simulation a bridge to the future-Volume 1. ACM,1999:850-855.

[18] Ouelhadj D,Petrovic S. A survey of dynamic scheduling in manufacturing systems. Journal of Scheduling,2009,12:417-431.

[19] Pereira J. The robust (minmax regret) single machine scheduling with interval processing times and total weighted completion time objective[J]. Computers & Operations Research,2015,66(C):141-152.

[20] Drwal M,Rischke R. Complexity of interval minmax regret scheduling on parallel identical machines with total completion time criterion[J]. Computer Science,2014,44(3):354-358.

[21] Lu Z,Cui W,Han X. Integrated production and preventive maintenance scheduling for a single machine with failure uncertainty[J]. Computers & Industrial Engineering,2015,80:236-244. 

[22] 张先超,周泓. 考虑急件到达的单机鲁棒调度方法[J]. 工业工程,2012,15(5):118-124.

[23] Lee J,Bagheri B,Kao H A,et al. Industry 4.0 and manufacturing transformation[J]. Manufacturing Leadership Journal,2015,(2):2-9.

[24] Koren Y,Heisel U,Jovane F,et al. Reconfigurable manufacturing systems[J]. CIRPAnnals,1999,48(2):527-540.