4.5 Governing and Lubricating Oil System Erection
4.5.1 Steam valve and governor valve erection.
Applicable scope:applicable to steam valve and governor valve inspection and erection,with the following inspection items:Steam valve and governor valve cleaning and inspection,Steam valve and governor valve erection.
1 Steam valve and governor valve cleaning and inspection and acceptance are given in Table 4.5.1-1.
Table 4.5.1-1 Steam valve and governor valve cleaning
Table 4.5.1-1(Continued)
2 Steam valve and governor valve erection inspection and acceptance are given in Table 4.5.1-2.
Table 4.5.1-2 Steam valve and governor valve erection
Table 4.5.1-2(Continued)
4.5.2 Actuator erection inspection and acceptance are given in Table 4.5.2.
Table 4.5.2 Actuator erection
Table 4.5.2(Continued)
4.5.3 Protection equipment erection.
Applicable scope:applicable to protection equipment erection,with the following inspection items:emergency governor erection,emergency tripping oil valve erection,emergency tripping device erection,4 other safety operation equipment erection.
1 Emergency governor erection inspection and acceptance are given in Table 4.5.3-1.
Table 4.5.3-1 Emergency governor erection
2 Emergency tripping oil valve erection inspection and acceptance are given in Table 4.5.3-2.
Table 4.5.3-2 Emergency tripping oil valve erection
Table 4.5.3-2(Continued)
3 Emergency governor device erection inspection and acceptance are given in Table 4.5.3-3.
Table 4.5.3-3 Emergency governor device erection
Table 4.5.3-3(Continued)
Table 4.5.3-3(Continued)
4 Inspection and acceptance of other safety operation device erection are given in Table 4.5.3-4.
Table 4.5.3-4 Other safety operation device erection
Table 4.5.3-4(Continued)
4.5.4 Main oil pump erection inspection and acceptance are given inTable 4.5.4.
Table 4.5.4 Main oil pump erection
4.5.5 Fire resistant fluid system device and tubing erection.
Applicable scope:applicable to fire resistant fluid system device and tubing erection,with the following inspection items:fire resistant fluid tank,oil pump,oil cooler,oil filter and accumulator erection,fire resistant fluid system tubing erection,fire resistant fluid system cycle flushing.
1 Fire resistant fluid tank,oil pump,oil cooler,oil filter and accumulator erection inspection and acceptance are given in Table 4.5.5-1.
Table 4.5.5-1 Fire resistant fluid tank,oil pump,oil cooler,oil filter and accumulator erection
2 Fire resistant fluid system pipe erection inspection and acceptance are given in Table 4.5.5-2.
Table 4.5.5-2 Fire resistant fluid tubing erection
Table 4.5.5-2(Continued)
3 Fire resistant fluid system cycle flushing inspection and acceptance are given in Table 4.5.5-3.
Table 4.5.5-3 Cycle flushing of fire resistant fluid system
4.5.6 Lubricating oil system device and piping erection.
Applicable scope:applicable to lubricating oil system device and piping erection,with the following inspection items:integrated oil tank erection,oil cooler erection,oil filter erection,vertical and horizontal type oil pump inspection and erection,oil pump trial run,oil filler and oil worm wheel pump erection,oil purification equipment erection,lubricating oil(jacking oil)pipe erection,lubricating(seal)oil system cycle flushing.
1 integrated oil tank erection inspection and acceptance are given in Table 4.5.6-1.
Table 4.5.6-1 Integrated oil tank erection
Table 4.5.6-1(Continued)
2 Oil cooler erection inspection and acceptance are given in Table 4.5.6-2.
Table 4.5.6-2 Oil cooler erection
Table 4.5.6-2(Continued)
3 Oil filter erection inspection and acceptance are given in Table 4.5.6-3.
Table 4.5.6-3 Oil filter erection
4 Vertical oil pump inspection and erection inspection and acceptance are given in Table 4.5.6-4.
Table 4.5.6-4 Vertical oil pump inspection and erection
5 Horizontal oil pump inspection and erection inspection and acceptance are given in Table 4.5.6-5.
Table 4.5.6-5 Horizontal oil pump inspection and erection
6 Oil pump trial run inspection and acceptance are given in Table 4.5.6-6.
Table 4.5.6-6 Oil pump trial run
Table 4.5.6-6(Continued)
7 Oil filler or oil worm pump erection inspection and acceptance are given in Table 4.5.6-7.
Table 4.5.6-7 Oil filler or oil worm pump erection
Table4.5.6-7(Continued)
8 Oil purifier erection inspection and acceptance are given in Table 4.5.6-8.
Table 4.5.6-8 Oil purifier erection
9 Lubricating oil piping,jacking oil piping erection inspection and acceptance are given in Table 4.5.6-9.
Table 4.5.6-9 Lubricating oil(jacking oil)piping erection
Table4.5.6-9(Continued)
10 Lubricating oil system,sealing oil system cycle flushing inspection and acceptance are given in Table 4.5.6-10.
Table 4.5.6-10 Lubricating oil system cycle flushing
Table 4.5.6-10(Continued)
4.5.7 Mandatory provisions implementation inspection for regulation and lubricating oil system equipment erection in subsection project are given in Table 4.5.7.
Table 4.5.7 Mandatory provision implementation inspection table for regulation and lubricating oil system equipment erection in subsection project
Table 4.5.7(Continued)
Table 4.5.7(Continued)