4.6 Generator and Exciter Erection

4.6.1 Generator sole plate in place inspection and acceptance are given in Table 4.6.1.

Table 4.6.1 Generator sole plate in place

img

Table 4.6.1(Continued)

img

4.6.2 Generator rotor inspection.

Applicable scope:applicable to generator rotor inspection,with the following inspection items:generator rotor inspection,rotor leakage test.

1 Generator rotor inspection and acceptance are given in Table 4.6.2-1.

Table 4.6.2-1 Generator rotor inspection

img

Table 4.6.2-1(Continued)

img

2 Rotor leakage test inspection and acceptance are given in Table 4.6.2-2.

Table 4.6.2-2 Rotor leakage test

img

4.6.3 Rotor lifting in place inspection and acceptance are given in Table 4.6.3.

Table 4.6.3 Rotor lifting in place

img

Table 4.6.3(Continued)

img

4.6.4 Stator leakage test inspection and acceptance are given in Table 4.6.4.

Table 4.6.4 Stator leakage test

img

Table 4.6.4(Continued)

img

4.6.5 Inserting rotor to generator inspection and acceptance are given in Table 4.6.5.

Table 4.6.5 Inserting rotor to generator

img

4.6.6 Water inlet and outlet support erection inspection and acceptance are given in Table 4.6.6.

Applicable scope:applicable to double water-cooled generator set.

Table 4.6.6 Water inlet and outlet support

img

4.6.7 Generator end-plate bearing erection inspection and acceptance are given in Table 4.6.7.

Applicable scope:applicable to generator stator in place inspection,with the following inspection items:generator end-plate bearing erection.

Table 4.6.7 Generator end-plate bearing erection

img

Table 4.6.7(Continued)

img

4.6.8 Air gap and magnetic center adjustment inspection and acceptance are given in Table 4.6.8.

Table 4.6.8 Air gap and magnetic center adjustment

img

4.6.9 Fan gap adjustment inspection and acceptance are given in Table 4.6.9.

Table 4.6.9 Fan gap adjustment

img

4.6.10 Sealing pad erection inspection and acceptance are given in Table 4.6.10.

Table 4.6.10 Sealing pad erection

img

Table 4.6.10(Continued)

img

Table 4.6.10(Continued)

img

4.6.11 ST-generator coupling centering inspection and acceptance are given in Table 4.6.11.

Table 4.6.11 ST-generator coupling centering

img

4.6.12 Generator oil baffle erection inspection and acceptance are given in Table 4.6.12.

Table 4.6.12 Generator oil baffle erection

img

4.6.13 Generator end cover erection and enclosure inspection and acceptance are given in Table 4.6.13.

Table 4.6.13 Generator end cover erection and enclosure

img

4.6.14 Hydrogen cooler erection inspection and acceptance are given in Table 4.6.14.

Table 4.6.14 Hydrogen cooler erection

img

Table 4.6.14(Continued)

img

4.6.15 Exciter erection.

Applicable scope:applicable to generator exciter erection,with the following inspection items:exciter stator and rotor inspection,exciter bearing erection,exciter coupling centering,exciter sole plate locating pin and housing erection,adjustment of exciter air gap and magnetic center,adjustment of gap between exciter fan,damper plate,oil baffle air cooler erection.

1 Exciter stator and rotor inspection and acceptance are given in Table 4.6.15-1.

Table 4.6.15-1 Exciter stator and rotor inspection

img

Table 4.6.15-1(Continued)

img

2 Exciter bearing erection inspection and acceptance are given in Table 4.6.15-2.

Table 4.6.15-2 Exciter bearing erection

img

Table 4.6.15-2(Continued)

img

3 Exciter coupling centering inspection and acceptance are given in Table 4.6.15-3.

Table 4.6.15-3 Exciter coupling centering

img

4 Exciter sole plate retaining pin and housing erection inspection and acceptance are given in Table 4.6.15-4.

Table 4.6.15-4 Exciter sole plate retaining pin and housing erection

img

5 Adjustment of exciter air gap and magnetic center inspection and acceptance are given in Table 4.6.15-5.

Table 4.6.15-5 Adjustment of exciter air gap and magnetic center

img

6 Adjustment of fan,air baffle,oil baffle gap inspection and acceptance are given in Table 4.6.15-6.

Table 4.6.15-6 Adjustment of fan,air baffle,oil baffle gap

img

7 Air cooler erection inspection and acceptance are given in Table 4.6.15-7.

Table 4.6.15-7 Air cooler erection

img

4.6.16 Carbon brush holder erection inspection and acceptance are given in Table 4.6.16.

Table 4.6.16 Carbon brush holder erection

img

4.6.17 Generator complete air pressure tests inspection and acceptance are given in Table 4.6.17.

Table 4.6.17 Generator complete air pressure tests

img

4.6.18 Sealing oil system erection.

Applicable scope:applicable to generator sealing oil system erection,with the following inspection items:1 screw type sealing oil pump erection and other equipment erection,2 sealing oil equipment erection,refer to general standard Table 4.3.33 integrated equipment erection;sealing oil pipe erection and flushing,refer to Table 4.5.6-9 lubricating oil(jacking oil)pipe erection and Table 4.5.6-10 lubricating oil system cycle flushing.

1 Screw type sealing oil pump erection inspection and acceptance are given in Table 4.6.18-1.

Table 4.6.18-1 Screw type sealing oil pump erection

img

Table 4.6.18-1(Continued)

img

2 Other equipment erection inspection and acceptance are given in Table 4.6.18-2.

Table 4.6.18-2 Other equipment erection

img

Table 4.6.18-2(Continued)

img

4.6.19 Internal cooling water system device and piping erection.

Applicable scope:applicable to generator internal cooling water system device and piping erection,with the following inspection items:1 internal cooling water pump erection,2 cooling water tank,cooler,ion exchanger erection,3 internal cooling water pipe erection,4 internal cooling water system flushing.

1 Internal cooling water pump erection inspection and acceptance are given in Table 4.6.19-1.

Table 4.6.19-1 Internal cooling water pump erection

img

Table 4.6.19-1(Continued)

img

2 Cooling water tank,cooler,ion exchanger erection inspection and acceptance are given in Table 4.6.19-2.

Table 4.6.19-2 Cooling water tank,cooler,ion exchanger erection

img

Table 4.6.19-2(Continued)

img

3 Internal cooling water piping erection inspection and acceptance are given in Table 4.6.19-3.

Table 4.6.19-3 Internal cooling water piping erection

img

Table 4.6.19-3(Continued)

img

4 Internal cooling water system flushing inspection and acceptance are given in Table 4.6.19-4.

Table 4.6.19-4 Internal cooling water system flushing

img

4.6.20 Gas system device and piping erection.

Applicable scope:applicable to generator gas system device and piping erection,with the following inspection items:1 gas system equipment erection,2 gas system pipe erection,3 gas pipe air duct test.

1 Gas system equipment erection inspection and acceptance are given in Table 4.6.20-1.

Table 4.6.20-1 Gas system equipment erection

img

2 Gas system pipe erection inspection and acceptance are given in Table 4.6.20-2.

Table 4.6.20-2 Gas system pipe erection

img

Table 4.6.20-2(Continued)

img

3 Gas pipe air pressure test inspection and acceptance are given in Table 4.6.20-3.

Table 4.6.20-3 Gas pipe air pressure test

img

4.6.21 Mandatory provision implementation inspection of generator and exciter erection subsection project is given in Table 4.6.21.

Table 4.6.21 Mandatory provision implementation inspection table of generator and exciter erection subsection project

img

Table 4.6.21(Continued)

img

Table 4.6.21(Continued)

img