上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人
10 Installation of Ladle Refining Furnace(LF)
10.1 General Requirements
10.1.1 This chapter shall be applicable to the quality acceptance for the installation of LF.
10.1.2 The installation of thermal insulation device for LF shall meet the requirement of the design technical document.