10.5 Electrode Lifting Mechanism and Electrode Clamping Mechanism
Ⅰ Dominant Items
10.5.1 The hydrostatic test and flushing test of the water cooling system for the electrode clamp head shall meet the requirement of Article 9.6.5 of the Code.
10.5.2 The insulation pad for connecting electrode mast bracket and horn as well as the tightening force for connecting bolts shall comply with the requirement of the design technical document.
Quantity to be checked:100%.
Inspection method:Observe,check with a torque wrench,and check the tightening record.
Ⅱ General Items
10.5.3 The allowable deviation for installation of electrode lifting mechanism and clamping mechanism shall comply with the requirements in Table 10.5.3.
Quantity to be checked:100%.
Inspection method:See Table 10.5.3.
Table 10.5.3 Allowable deviation for installation of electrode lifting mechanism and clamping mechanism