上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人
8.2 Upper Steel Structure
Ⅰ Major Items
8.2.1 Water pressure test of air-guiding walls and water-cooled beam in drying walls must be carried before the construction of upper steel structure in shaft furnace.Water pressure test shall meet the requirement of Article 8.1.1 of this code.
8.2.2 Welding quality shall meet the requirement of Article 7.3.1 of this code.
Ⅱ General Item
8.2.3 Allowable deviation of upper steel structure installation shall be in accordance with those specified in Table 8.2.3.
Quantity checked:All.
Checking method:Refer to Table 8.2.3.
Table 8.2.3 Allowable deviation of upper steel structure installation(mm)