上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人
7.3 Hydrocyclone
7.3.1 The installation of hydrocyclone shall be in accordance with the following requirements:
1 The maximum allowable deviation for longitudinal and horizontal centerlines shall be 5.0 mm;
2 The allowable deviation for feeding pipe center elevation shall be±10.0mm;
3 The maximum allowable deviation for perpendicularity shall be 1/1000;slanting installation shall comply with the requirements of equipment technical documents;
4 When installing in groups and rows,relative position difference shall be no more than 5.0mm;
5 Thermal cutting and welding shall not be carried out on the shell of cyclone with lining.
7.3.2 Test run shall meet the requirements of Article 3.0.11 in this code.