GB50170-2006电气装置安装工程旋转电机施工及验收规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

Foreword

According to the requirement of Document Jian Biao[2002]No.85 issued by Ministry of Construction(MOC)—Notice on Printing the Development and Revision Plan of National Engineering Construction Standards in 2001-2002,this code is revised on the basis of GB 50170-92 Electric Equipment Installation Engineering Code for Construction and Acceptance of Rotating Electrical Machines by Beijing Electric Power Construction Research Institute and relevant organizations.

This code comprises four chapters with the main contents as follows:general provisions,steam turbine generator and synchronous var compensator,electric motor,transfer and acceptance.

The provisions printed in bold type are compulsory ones and must be enforced strictly.

Chief Development Organization,Participating Development Organizations and Chief Drafting Staff are as follows:

Chief Development Organization:

Beijing Electric Power Construction Research Institute

Participating Development Organizations:

Shandong No.2 Electric Power Construction Corporation

Shandong No.1 Electric Power Construction Corporation

Anhui Electric Power Research Institute

Jiangsu No.1 Electric Power Construction Corporation

Shanghai No.1 Electric Power Construction Corporation

Shanghai No.2 Electric Power Construction Corporation

Chief Drafting Staff:

Chen Fayu Li Peiyuan Wei Guozhu Wen Yufeng Wang Qiang

Zhang Junqi Guo Jian