GB 50923-2013 钢管混凝土拱桥技术规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

Foreword

Following the requirements of Notice on Printing the Development and Revision Plan of National Engineering Construction Standards in 2011(Jian Biao〔2011〕No.17)issued by the Ministry of Housing and Urban-Rural Development,the code compilation organizations develop the Code based on intensive investigation and study,summary of practice experiences,review of relevant prominent international standards,and extensive consultation.

The code comprises 14 chapters and supplementary commentary on the provisions.The main technical contents include:General Provisions;Terms and Symbols;Materials;Basic Requirements;Calculation for Ultimate Limit States in Persistent Situations;Calculation for Serviceability Limit States in Persistent Situations;Structure and Detailing;Fabrication of Steel Tubes of Arch Ribs;Welding;Corrosion Protection Coating;Erection of Steel Tube Arch Ribs;Filling of Concrete;Construction of Other Structures;Maintenance.

The provisions that are printed in bold type are mandatory provisions and must be enforced strictly.

The Ministry of Housing and Urban-Rural Developments is in charge of the administration of the Code and the explanation of the mandatory provisions.Fuzhou University is responsible for the explanation of specific technical contents.All relevant organizations are kindly requested to feedback any questions,comments and suggestions associated with the implementation of the Code by the management group of the Code in College of Civil Engineering at Fuzhou University(Address:No.2 Xueyuan Road,University Town,Minhou,Fuzhou,Fujian 350108,China).

Chief Development Organizations:

      Fuzhou University

      CSCEC Strait Construction and Development Co.,Ltd

Participating Development Organizations:

      Shenzhen Municipal Design and Research Institute Co.,Ltd

      Sichuan Provincial Transport Department Highway Planning,Survey,Design and

      Research Institute

      Guangxi Road and Bridge Engineering Corporation

      Research Institute of Highway Ministry of Transport

      Changsha University of Science and Technology

      ChangAn University

      Wuhan University of Technology

      Harbin Institute of Technology

      Wuchuan Heavy Engineering Co.,Ltd

Chief Drafting Staff:

      Chen Baochun Wu Pingchun Wei jiangang Wu Qingxiong Mou Tingmin

      Chen Yiyan Chen Guanghui Ding Qingjun Ruan Jiashun Zhang Jianren

      Zha Xiaoxiong Zhang Jinquan Liu Yongjian Jiao Anliang

Chief Reviewing Staff:

      Zheng Jielian Huang Qiao Fan Wenli Peng Yuancheng Ma Biao

      Xu Yong Zhao Linqiang Cao Rui Long Yue