5G技术核心与增强:从R15到R16
上QQ阅读APP看书,第一时间看更新

参考文献

[1] 沈嘉,索士强,全海洋,赵训威,胡海静,姜怡华.3GPP长期演进(LTE)技术原理与系统设计.北京:人民邮电出版社,2008.

[2] R1-1709740. Way forward on RBG size, NTT DOCOMO. 3GPP RAN1#89, Hangzhou, China, 15th-19th May 2017.

[3] R1-1710164. Bandwidth part configuration and frequency resource allocation, Guangdong OPPO Mobile Telecom. 3GPP RAN1#AH_NR2, Qingdao, China, 27th-30th June 2017.

[4] R1-1711843. Outputs of offline discussion on RBG size/number determination, OPPO, Nokia, LGE, Samsung, vivo, ZTE, CATR. 3GPP RAN1#AH_NR2, Qingdao, China, 27th-30th June 2017.

[5] R1-1710323. Discussion on frequency-domain resource allocation, LG Electronics. 3GPP RAN1#AH_NR2, Qingdao, China, 27th-30th June 2017.

[6] R1-1801065. Outcome of offline discussion on 7. 3. 3. 1 (resource allocation)-part I, Ericsson, RAN1#AdHoc1801, Vancouver, Canada, January 22-26, 2018.

[7] R1-1706559. Way Forward on Dynamic indication of transmission length on data channel, ZTE, Microelectronics, Ericsson, Nokia, AT&T, vivo, Panasonic, Convida Wireless, Intel, KT Corp, CATT, RAN1#88bis, Spokane, USA, 3rd-7th April 2017.

[8] Final Report of 3GPP TSG RAN WG1 #AH_NR2 v1. 0. 0, Qingdao, China, 27th-30th June 2017.

[9] 3GPP TS 38. 214 v15. 6. 0, NR. Physical layer procedures for data (Release 15).

[10] R1-1800488. Text proposal on DL/UL resource allocation, Guangdong OPPO Mobile Telecom. 3GPP TSG RAN WG1 Meeting AH 1801, Vancouver, Canada, January 22nd-26th, 2018.

[11] R1-1610736. Summary of offline discussion on downlink control channels,Ericsson. 3GPP TSG RAN WG1 Meeting #86bis, Lisbon, Portugal, October 10-14, 2016.

[12] R1-1810973. Text proposal for DL/UL data scheduling and HARQ procedure, Guangdong OPPO Mobile Telecom. 3GPP TSG RAN WG1 Meeting #94bis, Chengdu, China, October 8th-12th, 2018.

[13] R1-1609744. HARQ operation for large transport block sizes, Nokia, Alcatel-Lucent Shanghai Bell, 3GPP RAN1 #86bis, Lisbon, Portugal 10th-14th October 2016.

[14] R1-1700958. TB/CB handling for eMBB, Samsung. 3GPP RAN1 NR Ad Hoc#1701, Spokane, USA, 16th-20th January 2017.

[15] R1-1701020. Enriched feedback for adaptive HARQ, Nokia, Alcatel-Lucent Shanghai Bell. 3GPP RAN1 NR Ad Hoc#1701, Spokane, USA, 16th-20th January 2017.

[16] R1-1702636. Multi-bit HARQ-ACK feedback, Qualcomm Incorporated. 3GPP RAN1 NR Ad Hoc#1701, Spokane, USA, 16th -20th January 2017.

[17] R1-1701874. On HARQ and its enhancements, Ericsson. 3GPP RAN1 #88, Athens, Greece 13th-17th February 2017.

[18] R1-1707725. Discussion on CBG-based transmission, Guangdong OPPO Mobile Telecom. 3GPP RAN1 #89, Hangzhou, P. R. China 15th-19th May 2017.

[19] R1-1706962. Scheduling mechanisms for CBG-based re-transmission, Huawei, HiSilicon. 3GPP RAN1 #89, Hangzhou, China, 15th -19th May, 2017.

[20] R1-1707661. Consideration on CB group based HARQ operation. 3GPP RAN1 #89, Hangzhou, P. R. China 15th-19th May 2017.

[21] R1-1721638. Offline discussion summary on CBG based retransmission. 3GPP RAN1 #91, Reno, USA, November 27th-December 1st, 2017.

[22] R1-1721370. Summary on CA Aspects, Samsung. 3GPP RAN1#91, Reno, USA, Nov. 27th-Dec. 1st, 2017.

[23] R1-1610083. Initial views on UL control channel design, NTT DOCOMO, INC. 3GPP RAN1 #86bis, Lisbon, Portugal 10th-14th October 2016.

[24] R1-1611698. Discussion on uplink control channel, Guangdong OPPO Mobile Telecom. 3GPP RAN1 #87, Reno, USA 14th-18th November 2016.

[25] R1-1700618. Summary of [87-32] : UL L1/L2 control channel design for NR, NTT DOCOMO, INC. 3GPP RAN1 AH_NR, Spokane, USA, 16th-20th January 2017.

[26] R1-1703318. On the short PUCCH for small UCI payloads, Nokia, Alcatel-Lucent Shanghai Bell. 3GPP RAN1#88, Athens, Greece, 13th-17th February, 2017.

[27] R1-1706159. Short duration PUCCH structure, CATT. 3GPP RAN1 #88bis, Spokane, USA 3rd-7th April 2017.

[28] R1-1705389. Performance Evaluations for Short PUCCH Structures with 2 Symbols, Samsung. 3GPP RAN1 #88bis, Spokane, USA 3rd-7th April 2017.

[29] R1-1711677. Summary of the E-mail Discussion [89-21] : On Long PUCCH for NR, Ericsson. 3GPP RAN1 NR Ad-Hoc#2, Qingdao, P. R. China, 27th-30th June 2017.

[30] R1-1711490. On the Design of Long PUCCH for 1-2 UCI bit, Ericsson. 3GPP RAN1 NR Ad-Hoc#2, Qingdao, P. R. China, 27th-30th June 2017.

[31] R1-1715567. Long-PUCCH for UCI of more than 2 bit, Huawei, HiSilicon. 3GPP RAN1 AH_NR#3, Nagoya, Japan, 18-21 September 2017.

[32] R1-1719972. Summary of email discussion [90b-NR-29] on PUCCH resource set. 3GPP RAN1 #91 Reno, USA, November 27th-December 1st, 2017.

[33] R1-1612063. Single-part/Multi-part PDCCH, Qualcomm. 3GPP RAN1 #87, Reno, USA, 14th-18th November 2016.