更新时间:2020-09-25 15:23:43
封面
版权信息
Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General Provisions
2 Terms
3 General Requirements
4 SF6 Circuit Breaker
4.1 Basic Requirements
4.2 Installation and Adjustment
4.3 Management and Filling of SF6 Gas
4.4 Transfer and Acceptance
5 Gas-insulated Metal-enclosed Switchgear(GIS)
5.1 Basic Requirements
5.2 Installation and Adjustment
5.3 Installation of SF6 Circuit Breaker in GIS
5.4 Installation for Disconnecting Switch and Earthing Switch in GIS
5.5 Management and Filling of SF6 Gas
5.6 Transfer and Acceptance
6 Vacuum Breaker and High-voltage Switch Cabinet
6.1 Basic Requirements
6.2 Installation and Adjustment of Vacuum Breaker
6.3 Installation and Adjustment of High-voltage Switch Cabinet
6.4 Transfer and Acceptance
7 Operating Device of the Circuit Breaker
7.1 Basic Requirements
7.2 Installation and Adjustment of Operating Device
7.3 Pneumatic Device
7.4 Hydraulic Device
7.5 Spring
7.6 Electromagnetic Device
7.7 Transfer and Acceptance
8 Disconnecting Switch,Load Switch and High-voltage Fuse
8.1 Basic Requirements
8.2 Installation and Adjustment
8.3 Transfer and Acceptance
9 Arrester and Discharge Gap of Neutral Point
9.1 Basic Requirements
9.2 Installation of Arrester
9.3 Installation of Discharge Gap of Neutral Point
9.4 Transfer and Acceptance
10 Dry-type Reactor and Wave Trap Coil
11 Capacitor
11.1 Basic Requirements
11.2 Installation of Capacitor
11.3 Installation of Coupling Capacitor
11.4 Installation of Compensation Device of Series Capacitor
11.5 Transfer and Acceptance
Explanation of Wording in This Code
Normative Standard