Foreword
This code is revised on the basis of GBJ 147-90 Electric Equipment Installation Engineering Code for Construction and Acceptance of High-voltage by the China Electric Power Research Institute jointly with all concerned organizations.
The code comprises 11 chapters with the main contents as follows:general provisions,terms,general requirements,SF6 circuit breaker,gas-insulated metal-enclosed switchgear,vacuum breaker and highvoltage switch cabinet,operating device of breaker,disconnecting switch,load switch and high-voltage fuse,arrester and discharge gap of neutral point,dry-type reactor and wave trap coil,as well as capacitor.
The clauses marked in black letter are compulsory provisions and must be enforced strictly.
Chief Development Organizations,Participating Organizations,Translation organizations,Chief Drafter Staff,Chief Examiners and Chief translator of this code:
Chief Development Organizations:
China Electric Power Research Institute(former State Power Electric Power
Construction Research Institute)
Guangdong Power Transmission & Transformation Engineering Co.,Ltd.
Participating Development Organizations:
Beijing Super High Voltage Company
State Grid DC Engineering Construction Co.,Ltd.
Shandong Power Transmission & Transformation Engineering Co.,Ltd.
Translation organizations:China Electric Power Research Institute
Chief Drafting Staff:
Lv Zhirui Zhang cheng Wang Jinhong He Guanheng Jing jin
Chen Yifu Liu Donggen Li Bo Ma Xuejun
Chief Examiners:
Chen Fayu Cai Xinhua Sun Guanfu Wu Kefen Xiang Yuhua
Jian Hancheng Li Guisheng Luo Xiqun Tan Changyou Jiang Feng
Zhou Yizhong Liao Wei Li Wenxue Cheng Hongqiang
Chief translator:
Sun Jiantao