Foreword
1 General Provisions
2 Terms
3 Basic Provisions
3.1 General Provisions
3.2 The Interface Between Erection and Buildings
4 Steel Structures and Metal Parts
4.1 General Provisions
4.2 Boiler Foundation Inspection,Lineation and Pad Iron Erection
4.3 Boiler Steel Structures Erection and Secondary Grouting
4.4 Manholes,Observation Holes and Boiler Setting Parts
4.5 Boiler Sealing Elements
4.6 Combustion Equipment
4.7 Air Heater
4.8 Inspection and Documentation
5 Heating Surface
5.1 General Provisions
5.2 Steam Drum,Steam-water Separator and Header
5.3 Waterwalls
5.4 Superheater,Reheater,Economizer and Desuperheater
5.5 Boiler Water Circulating Pump and Start-up Pump
5.6 Circulating Fluidized Bed Boiler Heating Surface Equipment
5.7 Hydrostatic Test
5.8 Inspection and Documentation
6 Boiler Attached Pipes and Accessories
6.1 General Provisions
6.2 Boiler Blowdown,Sampling,Heating,Drain and Discharge,Vent and Desuperheating Pipes
6.3 Start-up System
6.4 Water Level Indicator for Steam Drum
6.5 Safety Valves
6.6 Soot Blowing System
6.7 Inspection and Documentation
7 Flue Gas/Air Ducts,Fuel/Bulk Material Pipes and Auxiliary Equipment
7.1 General Provisions
7.2 Assembly and Erection of Flue Gas/Air Ducts and Fuel/Bulk Material Pipes
7.3 Accessories and Devices of Flue Gas/Air Ducts,Fuel/Bulk Material Pipes
7.4 Leak Test for Furnace and Flue Gas System
7.5 Dust Precipitators
7.6 Inspection and Documentation
8 Desulfurization and Denitrification
8.1 General Provisions
8.2 Flue Gas Desulfurization
8.3 Flue Gas Denitrification
8.4 Inspection and Documentation
9 Equipment and Pipes of Fuel Oil System
9.1 General Provisions
9.2 The Oil Unloading Device and Pipes
9.3 Oil Tank and Accessories
9.4 Oil Supply Equipment and Pump Room Pipes
9.5 Plant Fuel Pipes
9.6 Boiler Room Fuel Pipes
9.7 Blowing and Oil-passing Test of Fuel Oil System
9.8 Required Conditions Before Receiving Oil for Fuel Oil System
9.9 Inspection and Documentation
10 Boiler Auxiliary Machineries
10.1 General Provisions
10.2 General Rules for the Erection of Auxiliary Machineries
10.3 Oil System of Auxiliary Machinery
10.4 Coal Mills
10.5 Fans
10.6 Coal Feeder
10.7 Air Compressor
10.8 Ash Handling Equipment
10.9 Slag Dragging Machine
10.10 Slag Crusher
10.11 Bucket Chain Conveyor
10.12 Chain Bucket Elevator
10.13 Equipment of Bottom Ash Cooler
10.14 Inspection and Documentation
11 Coal Handling Equipment
11.1 General Provisions
11.2 Rubber Belt Coal Conveyor
11.3 Coal Unloader for the Rubber Belt Coal Conveyer
11.4 Magnetic Separator
11.5 Coal Crusher
11.6 Coal Screening Machine
11.7 Unloading Equipment and Coal Yard Equipment
11.8 Inspection and Documentation
12 Boiler Setting and Insulation & Corrosion Protection of Thermal Equipment and Pipes
12.1 General Provisions
12.2 The Refractory and Insulation Materials
12.3 Unshaped Abrasion Resistant Refractory Materials Construction
12.4 Furnace Lining Construction
12.5 Insulation Construction of Boiler Proper,Thermal Equipment and Pipes
12.6 Outer Casing Construction for Boiler Proper,Thermal Equipment and Pipes
12.7 Corrosion Protection
12.8 Seasonal Construction
12.9 Inspection and Documentation
13 Trial Operation and Acceptance of Boiler Unit
13.1 General Provisions
13.2 Main Points for Boiler Trial Operation
13.3 High Temperature Drying-out
13.4 Boiler Chemical Cleaning
13.5 Flushing and Blowing of Pipes
13.6 Steam Leak Test and Safety Valve Adjustment
13.7 Start-up Trial Operation of the Complete Boiler Unit
13.8 Inspection and Documentation
Appendix A Urban Refuse Incineration Boiler Erection