更新时间:2020-09-24 18:24:43
封面
版权页
Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General Provisions
2 Terms
3 Basic Requirements
4 Equipment Foundation,Anchor Bolts and Padding Plates
4.1 General Requinements
4.2 Equipment Foundation Acceptance and Resurvey,Setting Out of Benchmark and Baseline
4.3 Anchor Bolts
4.4 Padding Plates
5 Mobilization of Equipments,Elements and Materials
5.1 General Requirements
5.2 Equipment and Elements
5.3 Materials
6 Process Steel Structure Parts
6.1 General Requirements
6.2 Welding
6.3 Connection of High-strength Bolts
6.4 Part Fabrication and Assembly of Process Steel Structure
6.5 Fabrication of Shell
6.6 Fabrication of Frame,Corridor and Truss Work
6.7 Fabrication of Large-diameter Coil-welded Steel Pipe
6.8 Installation of Shell
6.9 Installation of Frame
6.10 Installation of Corridor and Truss
6.11 Installation of Large-diameter Coil-welded Steel Pipe
6.12 Coating
7 Blast Furnace Equipments Installation
7.1 Cooling Equipments of Furnace
7.2 Tuyeres Device
7.3 Slag Hole Devices and Taphole Sleeves
7.4 Gas Sampling Device
7.5 Commissioning of Gas Sampling Device
7.6 Throat Steel Brick
7.7 Furnace Top Guard Shield
8 Bell-Less Top Equipments Installation
8.1 Brackets of Top Equipments
8.2 Transmission Gear Box with Distributor Chute
8.3 Bellows
8.4 Valve Box
8.5 Charging Bucket
8.6 Receiving Hopper
8.7 Commissioning of Bell-less Charging Equipments
8.8 Vertical Detecting Device
8.9 Commissioning of Vertical Detecting Device
8.10 Gas Blow-off Valve and Equalizing Valve on Top
8.11 Commissioning of Gas Blow-off Valve and Equalizing Valve on Top
8.12 Installation and Commissioning of Top Ignition Device
8.13 Throat Spray Device
8.14 Throat Temperature Measuring Device
9 Feeding Equipments Installation
9.1 Installation and Commissioning of Electric Belt Discharging Car
9.2 Weighing Hopper
9.3 Coke Cutter
9.4 Commissioning of Coke Cutter
10 Charging Equipments Installation
10.1 Skip Charging Equipment
10.2 Commissioning of Skip Charging Equipment
10.3 Belt Charging Conveyer
10.4 Commissioning of Belt Charging Equipments
10.5 Vertical Belt Charging Equipment
10.6 Commissioning of Vertical Belt Charging Equipments
11 Equipments Installation Works of Tuyere Platform and Cast House
11.1 Hydraulic Clay Gun
11.2 Commissioning of Hydraulic Clay Gun
11.3 Taphole Machine
11.4 Commissioning of Taphole Machine
11.5 Slag Stopper Machine
11.6 Commissioning of Slag Stopper Machine
11.7 Slag,Iron Chute and Gate
11.8 Swing Launder
11.9 Main Chute Cover Carriage
11.10 Commissioning of Main Chute Cover Carriage
12 Hot-blast Stove Equipments Installation
12.1 Snout and Supports
12.2 Sleeve-type Burner and Combustion Air Fan
12.3 Commissioning of Combustion Air Fan
12.4 Valves of Hot-blast Stove
12.5 Commissioning of Valves of Hot-blast Stove
13 Blast Furnace Blowing Equipments Installation
13.1 Axial Blower
13.2 Commissioning of Blowers
13.3 Dehumidifier
13.4 Air Filter
13.5 Commissioning of Air Filter
13.6 Valves
14 Gas Cleaning Equipments Installation
14.1 General Requirements
14.2 Gas Shut-off Valves Dust Remover
14.3 Dust-cleaning Valve of Dust Remover and Ash Mixer
14.4 Commissioning of Dust-cleaning Valve of Dust Remover and Ash Mixer
14.5 Valve Group for Gas Pressure Regulating
14.6 Commissioning of Valve Group for Gas Pressure Regulating
14.7 Pressure Regulating Device for Circumferential Weld Scrubber
14.8 Gas Blow-off Valve
14.9 Horizontal Silencer
14.10 Leaf Type Flashboard
15 PCI Equipment Installation of Blast Furnace